May 2024: The “water miracle” of Mai Mahiu

Two large black water tanks

On 13 May 2024, I arrived at the GOA Children Home Beat The Drum. The drilling company Marine Well had already set everything up and began drilling immediately.

The drilling location had already been determined in February. During my visit at that time, Jesus Christ had shown me the exact location and also specified the drilling depth of 170 metres. I then organised and financed the drilling work from Switzerland (GOA had already carried out three unsuccessful drillings on the site, so further drilling was no longer possible through the organisation).

The prediction came true exactly. After three days, the drilling depth of 170 metres was reached. The 5-metre-long pipes, each weighing 130 kg, were removed.

On 16 May, the water level was checked. There was no fountain, as is sometimes the case elsewhere. An echo sounder detected water at a depth of 132 metres in the 170-metre-deep borehole. Everyone involved breathed a sigh of relief and rejoiced.

Further investigations followed: water was pumped out to determine how quickly the water level would return to its previous level.

It got even better: the water level rose to 144 metres. This was a clear sign that there was sufficient water available. The water was approximately 40 degrees Celsius and of good quality.

A few days later, there was a big celebration: a Celebration of Joy (an expression of joy, a festival with music, singing and food) and trees were planted to mark the occasion.

Now there is still a lot to do with the installation of pumps, pipes and a tank. Many thanks go to the drilling company, whose boss I met personally and whose team worked very well together.

My joy is immense! The fulfilment of what I learned from Jesus in February is wonderful. Now there is no longer any need to buy water with the tanker truck!